Project Description

City of Bradenton Fire Station #3

PROJECT SPECS

LOCATION     Bradenton, FL
SIZE     10,000 SF
COMPLETION DATE     
May 2022

COMPLEX HIGHLIGHTS

  • Three Pull-Through Bays Accommodates
  • Multiple Secured Pantries
  • Six Apparatus Houses
  • Day Room
  • 15 Crew Members Over 3 Shifts
  • Fitness Room

IMAGE GALLERY

PROJECT SCOPE

Fire Station #3 was designed to replace an existing house. Placement is in roughly the same location in order to utilize the driveway, curb cuts, traffic light and utility locations. The project required the use of the most cost efficient methods and materials to minimize costs under a hard bid delivery method. The final house holds up to six pieces of apparatus in three pull-through bays. The interior accommodates 15 crew members over 3 shifts, utilizing separate pantries and secure storage of personal belongings in each room.

SERVICES

  • Architecture
  • Construction Administration
  • Interior Design
  • Programming/Planning
  • Value Engineering
  • Conceptual Design

Delivery Method

  • Hard Bid

Construction Type

  • New Construction

MARKET SECTORS

  • Government

The Fawley Bryant Team was effective in offering guidance and navigating ideas from our committee of ten members to bring them to fruition.

– Tim Geer, Assistant Fire Chief

see more